Changeset 651


Ignore:
Timestamp:
11/26/12 11:21:52 (12 years ago)
Author:
wojtekp
Message:
 
Location:
papers/SMPaT-2012_DCWoRMS
Files:
4 edited

Legend:

Unmodified
Added
Removed
  • papers/SMPaT-2012_DCWoRMS/elsarticle-DCWoRMS.fdb_latexmk

    r650 r651  
    11# Fdb version 2 
    2 ["pdflatex"] 1353627755 "elsarticle-DCWoRMS.tex" "elsarticle-DCWoRMS.pdf" "elsarticle-DCWoRMS"  
     2["pdflatex"] 1353926300 "elsarticle-DCWoRMS.tex" "elsarticle-DCWoRMS.pdf" "elsarticle-DCWoRMS"  
    33  "/usr/local/texlive/2010/texmf-dist/tex/context/base/supp-pdf.mkii" 1251025892 71625 fad1c4b52151c234b6873a255b0ad6b3 "" 
    44  "/usr/local/texlive/2010/texmf-dist/tex/generic/oberdiek/etexcmds.sty" 1267408169 5670 cacb018555825cfe95cd1e1317d82c1d "" 
     
    2929  "/usr/local/texlive/2010/texmf-dist/tex/latex/psnfss/upsy.fd" 1137110629 148 2da0acd77cba348f34823f44cabf0058 "" 
    3030  "/usr/local/texlive/2010/texmf-dist/tex/latex/psnfss/upzd.fd" 1137110629 148 b2a94082cb802f90d3daf6dd0c7188a0 "" 
    31   "elsarticle-DCWoRMS.aux" 1353627757 4292 a515904da60b90122de1d94ff4164603 "" 
    32   "elsarticle-DCWoRMS.spl" 1353627756 0 d41d8cd98f00b204e9800998ecf8427e "" 
    33   "elsarticle-DCWoRMS.tex" 1353627753 45102 382aaf7bf43a885e9bda6d2635a7abea "" 
     31  "elsarticle-DCWoRMS.aux" 1353926301 4292 a515904da60b90122de1d94ff4164603 "" 
     32  "elsarticle-DCWoRMS.spl" 1353926300 0 d41d8cd98f00b204e9800998ecf8427e "" 
     33  "elsarticle-DCWoRMS.tex" 1353926298 45136 8e6cd2f043e6b20199324ae08768d5ef "" 
    3434  "elsarticle.cls" 1352447924 26095 ad44f4892f75e6e05dca57a3581f78d1 "" 
    3535  "fig/airModel.png" 1353405890 41411 f33639119a59ae1d2eabb277137f0042 "" 
  • papers/SMPaT-2012_DCWoRMS/elsarticle-DCWoRMS.tex

    r650 r651  
    185185As far as data center infrastructure level is concerned, DCSG Simulator is calculates the power and cooling schema of data center equipment with respect to their performance. User is able to take into account a wide variety of mechanical and electrical devices like: transformers, power distribution units, power supply, cabling, computer room air conditioning units and chiller plant. For each of them a numerous factors can be defined, including device capacity and efficiency, load operating points. These data can be derived from a generic list as well as from the information given by particular manufacturers. There is a wide range of pre-defined models, but user can easily extend them or create a new ones. 
    186186 
    187 To perform an IT simulation, it is possible to extend the data center infrastructure by putting IT devices into that data center. That enables detailed simulation of the energy efficiency of devices across a specified time period.  
     187To perform the IT simulation, it is possible to extend the data center infrastructure by putting IT devices into that data center. That enables detailed simulation of the energy efficiency of devices across a specified time period.  
    188188In this case performance of each piece of equipment (facility and IT) within a data center is determined by a combination of factors, including workload, data center conditions, the manufacturer's specifications of the machine's components and the way in which the machine is utilized based on its provisioned IT load.  
    189 IT is possible to bind the operational characteristics, proper to the particular geographic locations, with the simulation process. These characteristics may include temperature profile as well as the power cost that vary depending on the time and place. The output of this simulation is a set of energy and cost data representing the IT device and data center energy consumption, capital and operational costs. 
     189Users are possible to bind the operational characteristics, proper to the particular geographic locations, with the simulation process. These characteristics may include temperature profile as well as the power cost that vary depending on the time and place. The output of this simulation is a set of energy and cost data representing the IT devices (including PUE and metrics) and data center energy consumption, capital and operational costs. 
    190190 
    191191 
Note: See TracChangeset for help on using the changeset viewer.